Invitation to Bid: Secondary Metering Project

Separate sealed bids for the construction of MORONI SECONDARY METERING PROJECT 2023 will be received by Moroni City from bidders.

Bids will be publicly opened and read aloud at 11:00 AM on March 15th at 80 South 200 West Moroni. Utah 84646.

The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS.

Installing new meter assemblies and valve boxes on each existing secondary water connection.

This project is funded by Division of Water Resources.

Plans and specifications have been prepared by Sunrise Engineering, Inc. and will be available after February 13th on their website plan room at http://www.sunrise-eng.com. Click on “Plan Room” at the bottom of the homepage. Bidders must register and sign-in and choose to become a plan holder to obtain access to CONTRACT DOCUMENTS and DRAWINGS. Notices regarding changes/amendments to the CONTRACT DOCUMENTS and DRAWINGS will be sent to the e-mail address associated with the bidder’s registration. Bidders are responsible to maintain current and correct contact information and check the plan room often to receive updates or additional documents/changes/amendments. The ENGINEER for this Contract will be Sunrise Engineering, Incorporated and they will be represented by Robert Worlev. P.E. as Project Engineer.

A pre-bid tour will be held on February 22nd. at 10:00 AM. leaving from the office of the Owner at 80 South 200 West Moroni. Utah 84646 . Attendance at the pre-bid tour is not required but highly recommended.

Names of those in attendance will be recorded.

There will be a question deadline of March 6th at 2:00 p.m., and if any required addendums will be posted by March 9th at 2:00 p.m.